Cooling chamber system disassembly
During the maintenance period while the ice-cream factory was shut down during winter, we dismantled a complete cooling chamber system by opening the roof slab and lifting out the equipment through the roof of the hall. Our mechanical and electrical specialists professionally disassembled and removed the refrigeration equipment and the associated production lines from their installation site, prepared them for transport, and put them in the yard.