Next we inserted the screws (each weighing 7 tonnes and measuring 6 metres in length) into their barrels, using our mobile hall crane and forklift truck. This was a delicate task, because the internal alignment of the barrel and the screw had to be accurate to within a tenth of a millimetre, so we had to devise and apply a fully horizontal binding method for the lifting. For stacking the platforms and placing the machines on them we also relied on our 60 tonne Ormig Pick&Carry crane. The other units in the extruder line were positioned with roller skids and a forklift truck. We completed the project to the full satisfaction of the customer, in cooperation with their supervisor.