Electrical system modifications
We carried out electrical modifications on six EXA rubber building machines. Our task was to prepare the electrical installation of 12 QA PC cabinets, as well as field wiring and installation into the EXA machines. The customer provided the installation materials. The work took six days. After the installation we also performed electrical safety and loop resistance tests
We carried out electrical modifications on six EXA rubber building machines. Our task was to prepare the electrical installation of 12 QA PC cabinets, as well as field wiring and installation into the...